by limiting the surface area of grains to be coated in cement
dispensing with the soil altogether and using just the sand as the construction material
Guidelines for Golf Greens
Top dressing is an essential part of the management of winter games pitches
Even a few months of play on a slit drained pitch with no sand dressing can negate the value of the drainage work
Laying Course Material for Porous Pavements Rootzone by limiting the surface areaMaterials must meet the requirements of BS7533 3, BS7533 4 and the Interpave's Guide for Porous Pavements. Category to BSEN 13242 or BSEN 12620 Grading 4 40, GC85 15 GTC20 17. 5, f4, F120, LA30, WA242, M518, MDE20, AS0 and a defined grading. Further information relating to this product can be found here